EUR100MillionProject

Alvora not cleared to build Lithuanian N-plant’s EUR 100 mln repository

Alvora, an energy construction company that built the strategically important Gas Interconnection Poland-Lithuania (GIPL), has failed to obtain clearance to build the Ignalina Nuclear Power Plant’s near-surface repository, worth an [..]

EURO

Trending

Tallinn

loader-image
temperature icon 12°C
overcast clouds
Wind Gust: 28 Km/h
Clouds: 100%

Riga

loader-image
temperature icon 14°C
overcast clouds
Wind Gust: 21 Km/h
Clouds: 87%

Vilnius

loader-image
temperature icon 12°C
broken clouds
Wind Gust: 2 Km/h
Clouds: 84%