EnergyInfrastructure Environmental Concerns Regulatory Hurdles Infrastructure Development

Alvora not cleared to build Lithuanian N-plant’s EUR 100 mln repository

Alvora, an energy construction company that built the strategically important Gas Interconnection Poland-Lithuania (GIPL), has failed to obtain clearance to build the Ignalina Nuclear Power Plant’s near-surface repository, worth an [..]