EnergyInfrastructure Environmental Concerns Regulatory Hurdles Infrastructure Development

Alvora not cleared to build Lithuanian N-plant’s EUR 100 mln repository

Alvora, an energy construction company that built the strategically important Gas Interconnection Poland-Lithuania (GIPL), has failed to obtain clearance to build the Ignalina Nuclear Power Plant’s near-surface repository, worth an [..]

EURO

Trending

Tallinn

loader-image
temperature icon 21°C
overcast clouds
Wind Gust: 14 Km/h
Clouds: 100%

Riga

loader-image
temperature icon 26°C
broken clouds
Wind Gust: 22 Km/h
Clouds: 73%

Vilnius

loader-image
temperature icon 27°C
broken clouds
Wind Gust: 18 Km/h
Clouds: 72%