EnergyInfrastructure Environmental Concerns Regulatory Hurdles Infrastructure Development

Alvora not cleared to build Lithuanian N-plant’s EUR 100 mln repository

Alvora, an energy construction company that built the strategically important Gas Interconnection Poland-Lithuania (GIPL), has failed to obtain clearance to build the Ignalina Nuclear Power Plant’s near-surface repository, worth an [..]

EURO

Trending

Tallinn

loader-image
temperature icon -2°C
broken clouds
Wind Gust: 0 Km/h
Clouds: 75%

Riga

loader-image
temperature icon 1°C
scattered clouds
Wind Gust: 0 Km/h
Clouds: 40%

Vilnius

loader-image
temperature icon 2°C
broken clouds
Wind Gust: 0 Km/h
Clouds: 75%