Poland marked a new milestone in its largest-ever naval shipbuilding programme on 24 November 2026, with a keel-laying ceremony for the future frigate ORP Huragan at PGZ Stocznia Wojenna in Gdynia.
The ceremony was attended by Magdalena Sobkowiak-Czarnecka, Secretary of State at the Polish Ministry of National Defence, and marks the third and final vessel to enter construction under the Miecznik programme, which also covers the frigates ORP Wicher and ORP Burza.
The Miecznik programme is described by the Polish defence ministry as the largest naval undertaking in the history of the Polish Navy. The three multirole frigates are intended to strengthen Poland’s capacity to counter maritime threats, protect sea lanes and critical infrastructure, and operate alongside allied fleets within NATO.
Each vessel will be equipped with an Integrated Mission System covering the bridge, communications, platform management, and a combat system with sensors and effectors. Armament will include air and missile defence systems, weapons for surface and land targets, and torpedoes for anti-submarine warfare.
Deputy Prime Minister and Defence Minister Wladyslaw Kosiniak-Kamysz, in a message to ceremony participants, stressed that the Baltic Sea holds particular strategic importance and that investment in modern naval forces is a necessary element of building Poland’s credibility within the North Atlantic Alliance.
The ministry also highlighted the programme’s industrial dimension, noting that construction of the frigates is intended to develop domestic technological competencies, strengthen production capacity, and build expertise for future defence projects in Poland.
Source: gov.pl





